JAK SE (NE)STAVĚL MOST-How the Bridge Was (Not) Built
Medieval Prague appears one last time in our game. Charles Bridge was supposed to be finished long ago. However, the construction is not progressing according to plan. You are in charge of the entire project, so you must find out who is behind these acts of sabotage.
Follow the trail left by the saboteur and solve this mystery.
For 43 years, the construction of Charles Bridge has been progressing very slowly. The delays have become significant, and merchants are putting a lot of pressure on you because they have to pay for the ferry. Strange things have started happening at the construction site, and it is highly likely that someone is behind these events. Petr Parléř, as the project leader, has entrusted you with investigating these unusual occurrences. The saboteur is leaving behind clues, and you must solve the mystery.
JAK SE (NE)STAVĚL MOST
JAK SE (NE)STAVĚL MOST Středověká Praha se objevuje naposledy v naší hře. Karlův most měl být dávno dokončen. Stavba však postupuje podle plánu. Jsi zodpovědný za celý projekt, takže musíš zjistit, kdo stojí za těmito sabotážemi. Přijďte po stopách, které sabotér zanechal, a vyřešte tuto záhadu. Už 43 let se stavba Karlova mostu posouvá velmi pomalu. Zpoždění jsou významná a obchodníci na tebe vyvíjejí velký tlak, protože musí platit za přívoz. Na stavbě začaly probíhat podivné události a je vysoce pravděpodobné, že za těmito událostmi někdo stojí. Petr Parléř, jako vedoucí projektu, tě pověřil vyšetřováním těchto neobvyklých událostí. Sabotér za sebou zanechává stopy a ty musíš vyřešit tuto záhadu.
- LENGTH OF THE GAME: 1-1,5 HOD
- DISTANCE: 2 KM
- NUMBER OF TASKS / CIPHERS: 9 / 4
- DIFFICULTY OF THE GAME: 2/10
- LANGUAGE: CZ / EN
- PRICE: 650 KČ
- REQUIRED EQUIPMENT:
Game brochure (which you will receive at the start at the U Tří růží brewery), at least one charged smartphone with internet access, a pencil, and paper.
Reviews
There are no reviews yet.